$75,000 kitchen
Cabinets ~28%, counters 14%, MEP 12%.
Cabinet line ~$21k — compare to three shop quotes before locking floor tile.
An independent toolkit for the skilled trades.No paid rankings. No lead selling.
Calculator · Free
Split a total remodel budget into line items by room type — and see which categories most often overrun.
Allocated budget
$75,000
| Category | Share | Budget | Overrun risk |
|---|---|---|---|
| Cabinets & hardware | 28.0% | $21,000 | high |
| Countertops & backsplash | 14.0% | $10,500 | high |
| Appliances | 15.0% | $11,500 | medium |
| Demo, labor & GC | 22.0% | $16,500 | medium |
| Plumbing, electrical, gas | 12.0% | $9,000 | high |
| Flooring & paint | 9.0% | $6,800 | low |
Watch these lines first
Tile, plumbing moves, and cabinet upgrades consume contingency first. The allocator flags high-risk lines so you cap allowances early.
Total construction budget multiplies fixed planning shares per room type. Dollars per line highlight where overruns cluster. Contingency on whole-house plan is its own line — do not double-count with project contingency tool.
Cabinets ~28%, counters 14%, MEP 12%.
Cabinet line ~$21k — compare to three shop quotes before locking floor tile.
Tile 22%, labor 35%.
Tile near $6k — waterproofing scope must fit inside tile line.
8% hold contingency ≈ $9,600.
Do not allocate contingency to finishes until mid-project.
Labor-heavy markets shift dollars from materials to labor lines without changing total band much.
Shares editorialized from NAHB remodel component studies and True Trade Path planner defaults.
Counterpart bridge
This page interprets quotes and budgets from the buyer’s chair. The matching pro tool uses the same scope logic to build a defensible price.
Open Job Pricing CalculatorFor trade owners
Homeowners see national ranges on this page. If you are building the estimate, use the same scope assumptions — then price to burdened labor, overhead recovery and a real margin.
We never sell leads. Read the promise.
When you are ready to hire for remodel budget allocator, start with licence verification — not with whoever answered first.
No paid placement
Verify any licence yourself before signing: state licensing hub.
The next decision usually follows directly from this one.