Compare two to four contractor bids side by side — price, terms, and what the low bid is probably missing.
Local benchmark in Atlanta
$3,473
Expected range $1,786–$8,930 for upgrade the service panel to 200 a.
Bid spread21.4% between lowest and highest
$900
RecommendedBest combined price and terms score
Contractor A
Side-by-side price comparison
Bid
Price
vs typical
Price position
Terms score
Combined
Contractor A
$4,200
+20.9%
Within range
100 / 100
87 / 100
Contractor B
$5,100
+46.8%
Within range
61 / 100
48 / 100
Contractor C
$4,800
+38.2%
Within range
100 / 100
77 / 100
Terms gap — what the lowest bid is probably missing
Term
Contractor A
Contractor B
Contractor C
Explicit list of exclusions
✓
—
✓
Written change-order procedure
✓
—
✓
Parts or manufacturer warranty term stated
✓
—
✓
Proof of workers' compensation
✓
—
✓
Progress payments tied to milestones
✓
—
✓
Final payment due after inspection
✓
—
✓
Lien waiver provision
✓
—
✓
Verify every contractor independently
This tool compares paperwork and price against benchmarks. Look up each license on your state board site and have insurance certificates sent by the agent, not the contractor.
What this assumes
Benchmarks reflect typical U.S. residential pricing for standard access and materials.
Terms scoring uses common consumer-protection practice, not the law of any specific state.
You enter what each quote actually contains — the tool does not read PDFs.
Important
Price and paperwork are only part of the decision. Verify each contractor's license on your state board site and confirm insurance certificates directly from the agent.
Understanding the result
Normalize scope before you compare price
A $6,500 HVAC quote that overlays existing equipment is not cheaper than an $8,000 quote that includes tear-off, disposal, permit, and a 10-year labor warranty. List what each bid includes — materials, permits, disposal, warranty — before treating the lowest number as the winner.
The spread between bids tells a story
When three bids cluster within 15% and one sits 30% below, the low bid usually excluded something the others included. When all four bids scatter across a 40% range, you may be comparing different scopes, different equipment tiers, or contractors at different experience levels.
Terms score matters as much as dollars
A complete quote names materials, states who pulls the permit, lists exclusions, defines change orders, prints the license number, and ties payments to milestones. A bid that scores 45 out of 100 on terms is a negotiation document, not a contract ready to sign.
The best value is rarely the cheapest
Weight price at 40% and terms at 60% in this tool because residential disputes start with missing scope and bad payment terms, not with a 5% price difference. A mid-priced bid with complete terms usually beats a low bid that will generate change orders.
How the math works
You enter two to four bids with the same unit (total dollars or price per square/linear foot). The tool normalizes totals, computes spread (high vs low), median, and percent difference, then highlights when low bidders likely omitted scope or high bidders added warranty or premium materials.
Where to find each input
Bid totals — bottom-line numbers after tax if tax is included in the proposal
Scope notes — tear-off vs overlay, permit included, warranty years
Unit counts — squares of roofing, linear feet of fence, tonnage of HVAC
Allowance caps — dollar limits for fixtures, tile, or cabinets
Worked examples
Three roofing bids on 22 squares
Bid A $9,800 overlay; Bid B $11,200 tear-off + synthetic; Bid C $13,900 tear-off + ice barrier + 10-year labor warranty.
Spread 42% low to high. Median $11,200. Tool flags A as non-comparable (overlay vs tear-off). Normalized comparison should use B vs C only — $2,700 gap may be warranty and ice barrier.
Two HVAC quotes, same tonnage
Both 3-ton heat pump: $6,400 vs $7,900. Low bid excludes line set; high includes line set, permit, and 2-year labor.
22% spread. After adding ~$800–$1,200 for line set and permit to the low bid, effective gap shrinks — low bid may not be cheaper.
Fence installation per linear foot
120 lf: $28/lf vs $34/lf vs $31/lf. All include posts and gates.
Median $31/lf ($3,720 total). Spread 21%. Middle bid is anchor; verify post size and panel height match on all three.
What this does not include
Automated scope extraction from PDFs
Contractor background checks
Time-value of schedule differences beyond your notes
Financing or rebate math
Regional adjustment
Compare bids from the same metro when possible. A low bid from a distant crew with travel charges omitted will look artificially cheap against local firms. Adjust expectations using your city’s cost index on related cost guides.
Accuracy and references
Spread thresholds follow remodeling industry guidance (Consumer Reports, NAHB) that gaps above ~30% usually indicate scope mismatch, not just margin. Square and tonnage benchmarks tie to True Trade Path cost guide medians.
Counterpart bridge
Pricing this on the contractor side?
This page interprets quotes and budgets from the buyer’s chair. The matching pro tool uses the same scope logic to build a defensible price.
Homeowners see national ranges on this page. If you are building the estimate, use the same scope assumptions — then price to burdened labor, overhead recovery and a real margin.
Line up scope first: same materials, same inclusions, same warranty. Then compare price. Use a checklist for permit responsibility, exclusions, deposit terms, and insurance. A bid 30% below the others usually left something out.
Should I always pick the lowest bid?+
No. The lowest residential bid is frequently the one missing permits, insurance, disposal, or scope that becomes a change order. Pick the bid with complete terms inside a reasonable price range, then verify the license.
How much spread is normal between contractor quotes?+
For identical written scope, bids usually cluster within 15 to 25%. A spread above 30% means you are likely comparing different scopes, equipment tiers, or one bid that excluded major items.
What if all my bids are above the typical range?+
Ask each contractor what drives the premium — difficult access, code upgrades, premium materials, or current backlog. If none can explain it specifically, get a fourth quote. High prices with vague scope are a red flag.
How many quotes should I get?+
Three is standard for any job above a few hundred dollars. Two leaves you without a benchmark; more than four rarely changes the answer and delays the work.
How many bids should I compare?+
Three is standard for jobs over a few hundred dollars. Comparing two is acceptable for small repairs if scope is identical.
Should I pick the median bid?+
Not automatically. Use median as anchor after scopes match. The best bid is complete scope, fair terms, and verified license — not necessarily the middle number.
What if the lowest bid is 40% below others?+
Treat as a scope or insurance red flag until the bidder lists what others include. Overlay vs tear-off alone can explain 30%+ spreads on roofs.
Do I include tax in totals?+
Be consistent. If one quote is pre-tax and another includes tax, normalize before comparing.
Can I compare hourly vs fixed bids?+
Only with caution. Convert time-and-materials to an estimated cap or compare only fixed-price bids for the same scope.
What about allowances?+
Normalize allowance caps and who selects finishes. A low bid with a $500 fixture allowance vs $2,000 elsewhere is not apples-to-apples.
Should warranty years match?+
Yes for roofing and HVAC labor warranties. Material warranties follow manufacturer; labor warranty length should be noted on each bid.
How do I compare payment terms?+
Note deposit % on each bid. A cheaper price with 50% upfront may be worse risk than a median price with 15% deposit.
Is verbal pricing comparable?+
No. Compare written quotes with the same date and scope. Verbal numbers are not binding.
When is spread too small to matter?+
Under 10% on identical scope often comes down to schedule and reputation — not math.