How much should a carpenter charge?
Finish and remodeling carpenters bill $55–$95 per hour; framing crews often bid $4–$9 per square foot of floor area — with custom trim, decks, and built-ins quoted from burdened labor, material markup, and 15–22% net margin targets.
- Reviewed
- National carpentry benchmarks, reviewed March 2026
How to use this guide
Carpentry pricing splits rough framing (production by the square) from finish and remodel work (hourly or unit pricing). This guide helps you place your shop rate against burden and against homeowner deck and remodel expectations.
Deck and structural work needs permit and hardware detail in the estimate; interior trim needs finish level (paint-grade vs stain-grade) spelled out so change orders are not fights about “builder grade.”
Use the carpenter hourly rate calculator with your real overhead and utilization — finish work utilization is often higher than service trades but rework is costlier.
Framing vs finish
Framing bids that win on $/sf alone often omit hardware, shear, and crane days. Finish carpenters who underprice hourly forget client meetings and site protection time.
Fixed-price built-ins need shop drawings or sketches approved before cutting — otherwise “simple bookshelf” becomes custom casework at hourly loss.
Rate build-up
From wage to billable rate
Carpenter wage times burden, plus tool replacement and vehicle stock. Overhead includes insurance, software, and owner salary; margin on sell price, not on wage.
| Step | Example range |
|---|---|
| Base wage (finish / remodel carpenter) | $24–$38/hr |
| Labor burden | × 1.35–1.48 |
| Loaded labor | $32–$56/hr |
| Overhead recovery | + 28–38% |
| Profit target | + 15–22% net |
| Shop rate / framing bid basis | $55–$95/hr; $4–$9/sf framing |
Typical service rates by region
Union metros push hourly bands; rural framing may bid lower $/sf with longer travel between jobs.
Rural / South
Labor: $50–$75/hr
Trip / diagnostic: $350–$600 min
National
Labor: $60–$85/hr
Trip / diagnostic: $450–$800 min
Union metros
Labor: $75–$110/hr
Trip / diagnostic: $650–$1,100 min
Worked example
Wood deck (12×16, standard footings, wood rail)
Deck example assumes standard wood frame, permitted, no hillside engineering. Composite, cable rail, and footing depth changes move labor and material — take off from plans.
| Labor (48 hrs loaded, 2-person crew) | $2,400 |
| Materials (lumber, hardware, concrete) | $2,100 |
| Material markup (15%) | $315 |
| Permit & overhead | $680 |
| Margin (18% net target) | $1,045 |
| Indicative customer price | Customer price ≈ $6,540 (~$34/sf deck surface — composite and cable rail higher) |
Price ranges homeowners compare
Use $/sf for decks and additions; hourly or unit for trim and doors. Job-cost from the last similar job.
- Finish carpentry (hourly) — $55–$95/hr
- Framing (per sf floor) — $4–$9/sf
- Interior door install (each) — $175–$350
- Crown molding (per linear ft) — $6–$14/ft
- Deck (wood, per sf) — $30–$55/sf
Where margin disappears
Carpentry margin dies on vague finish levels, missing hardware lines, and framing quotes without shear and hold-down detail.
- Framing bid without plans — Shear, hold-downs, and crane days erase margin.
- Finish level undefined — Paint-grade vs stain-grade trim doubles material and labor.
- Hourly rate from wage only — Loaded cost and 65% utilization need $70+ hr for 15% net.
Quotes, minimums, and payment
Minimums & trip charges
Minimum service charge for half-day carpentry — $350–$650 — protects small trim and repair tickets. Decks and additions below your crew-day floor should be declined or repriced.
Markup vs margin
Lumber markup is thin when customers compare to big-box; margin often lives in labor and expertise lines. Do not compete with handyman hourly on structural work.
Exclusions & change orders
Engineering, drywall, roofing tie-in, and electrical for decks are separate trades unless you hold those licences. Site access, staging, and paint are exclusions on trim-only quotes.
Payment schedule
Deposits on material-heavy jobs; draw at framing and finish milestones on additions. Service work due on completion unless commercial terms apply.
Presenting the price
Show drawings or sketches, lumber spec, hardware schedule, and finish level. Deck quotes should list footing depth, rail type, and permit inclusion.
Use these next
FAQ
How much do carpenters charge per hour?
How to price a deck?
Framing per square foot?
What margin for carpentry?
Should I charge for estimates?
Do homeowners see deck costs?
Union vs non-union rates?
Custom built-ins?
Methodology
Benchmarks reference BLS carpenter wages and our carpenter hourly rate calculator. Lumber volatility affects material lines — update quotes when truss and sheet goods move.