Calculator · Free
Framing Material Calculator
Count studs, plates, headers and sheathing for a wall from length, height and spacing.
Studs to order
62studs
- Sheathing panels4×8 panels over 192 sq ft
- 7 sheets
- Studs and sheathing costPlate, header and fastener stock priced separately
- $427
- Plate stock5 sticks at 16 ft — single bottom, double top
- 72 lf
- Header and sill stock11 lf header, 7 lf sill
- 18 lf
- Fasteners444 framing and 385 sheathing nails
- 13 lb
| Component | Quantity | How it was counted |
|---|---|---|
| Field studs | 19 | 288 in ÷ 16 in, plus one for the end |
| Corner studs | 4 | 2 corners × 2 extra |
| Tee backing studs | 1 | 1 intersection × 1 extra |
| Door kings and jacks | 4 | 1 door × 2 king + 2 jack |
| Door cripples above header | 4 | 4 per opening at 16 in OC |
| Window kings and jacks | 8 | 2 windows × 2 king + 2 jack |
| Window cripples above and below | 16 | 4 above and 4 below each |
| Layout subtotal | 56 | Every stud the drawing calls for |
| Waste at 10% | 6 | Crooks, splits and bad cuts |
| Studs to order | 62 | $301 |
| Item | Quantity | Unit | Cost |
|---|---|---|---|
| Studs, 8 ft wall | 62 | each | $301 |
| Bottom plate | 24 | linear ft | — |
| Double top plate | 48 | linear ft | — |
| Plate stock as 16 ft sticks | 5 | sticks | — |
| Header stock | 11 | linear ft | — |
| Window sill stock | 7 | linear ft | — |
| Sheathing, 4×8 panels | 7 | sheets | $126 |
| 16d framing nails | 444 | nails (9.1 lb) | — |
| 8d sheathing nails | 385 | nails (3.6 lb) | — |
| Priced items | 62 studs + 7 sheets | $427 |
Field studs inside openings are not deducted
Plates assume a single bottom plate and a double top plate. Header sizing is not structural design: the linear footage here is stock length only, and the depth and ply count for a load-bearing header come from the span tables in IRC Table R602.7 or from an engineer. Fastener counts assume hand nailing at code schedule and will run higher off a coil nailer.
What this assumes
- Stud count assumes one stud per spacing interval plus one, with extra studs at corners and openings.
- Plates assume a single bottom plate and a double top plate.
- Sheathing is calculated in 4×8 panels with a default 10% waste allowance.
Understanding the result
16 versus 24 inch on center
Sixteen inch spacing is the residential default and is required for some sheathing and siding assemblies. Twenty-four inch advanced framing uses roughly a third less lumber and leaves more room for insulation, but demands thicker sheathing and careful alignment of studs, joists and trusses.
Where the extra lumber goes
Material lists routinely come up short because corners, tee intersections, headers, cripples, sills and blocking are not part of the on-center count. Those details can add 15 to 20% to a wall's stud count on a plan with many openings.
You may also need
The next decision usually follows directly from this one.
- CalculatorDrywall & Finishing CalculatorCount sheets, screws, joint compound and tape for a room, minus openings.
- CalculatorBoard Foot CalculatorConvert lumber dimensions to board feet and price a material order.
- CalculatorConcrete CalculatorCalculate cubic yards for slabs, footings, columns and stairs, with waste allowance.
- EstimatorRenovation Cost EstimatorEstimate a kitchen, bath, basement or addition project by scope, finish level and region.