Planner · Free

Deck Project Planner

Size, height and material → footing-to-railing budget, trades and IRC inspection reminders.

Deck layout
ft
ft
3 ft
1
Budget & schedule
1.00×
$

Budget range

$18,416

to $22,917 · 3–8 weeks
Line items
CategoryLowHigh
Footings & posts$998$1,242
Framing & hardware$3,992$4,967
Decking boards$8,467$10,537
Railing system$2,691$3,349
Stairs & landings$1,980$2,464
Permit & inspection$288$358
Trade sequence
Layout & permits → Footings cure → Frame & ledger → Decking & rail → Final inspection
Trades involved
Deck builder or carpenter, Concrete (footings)
Materials to spec in the contract
ItemQuantity
Decking224 sq ft — composite
Ledger flashing1 — bolt pattern per code
RailingHeight & baluster spacing in spec
ConcreteBags or truck — footing count in plan

Likely hidden costs

House sheathing rot at ledger · Rock excavation for footings · HOA design review delay · Upgrade to composite after PT quote

Quick answer

A new attached deck often costs roughly $35–$70 per square foot installed for composite at raised height with railing, and less for ground-level pressure-treated wood. Size, height, material, and stairs drive the range below — verify ledger flashing, footing depth, and guardrail code with your contractor.

What this assumes

  • Illustrative defaults — replace with your actual costs and local rules.

Understanding the result

How to use this

Size, height and material → footing-to-railing budget, trades and IRC inspection reminders.

How the math works

Deck area, height above grade, material, railing, and stairs scale footings, framing, decking, and permit lines. Height multipliers reflect bracing and labor for raised decks; composite and hardwood raise material share versus pressure-treated.

Where to find each input

  • Length × width — plan dimensions; add 5–10% waste on boards
  • Height — measure top of ledger to grade for footing depth rules
  • Material — PT vs composite vs hardwood on quote
  • Railing — linear feet of open sides plus stair runs
  • Stair flights — count from grade breaks to deck surface

Worked examples

14×16 composite raised deck

3 ft height, railing, one stair flight, mid tier.

Often mid-five figures installed — compare per-sf against `/home/cost/deck-building` bands.

12×12 PT platform

Low height, no stairs, no rail (verify code), budget tier.

Material-heavy, lower labor — still need ledger flashing and footings per IRC.

20×14 hardwood with two stairs

Premium hardwood, 4 ft height, full rail.

Hardwood and height drive top of range; verify stainless fasteners and annual maintenance budget.

What this does not include

  • Under-deck drainage systems
  • Outdoor kitchen gas run
  • Hot tub structural engineering
  • Staining schedule after PT install
  • HOA design fees

Regional adjustment

Frost depth footings vary from 12 inches to 48+ inches — northern climates add concrete cost. Coastal corrosion may require stainless hardware. Seismic and high-wind areas need additional lateral bracing.

Accuracy and references

Guardrail height (36 in residential typical), baluster spacing, and ledger bolting follow IRC deck provisions — confirm local amendments. Cost bands align with RSMeans residential wood deck medians.

Counterpart bridge

Pricing this on the contractor side?

This page interprets quotes and budgets from the buyer’s chair. The matching pro tool uses the same scope logic to build a defensible price.

Open Deck Material Calculator

For trade owners

Pricing this job as a contractor?

Homeowners see national ranges on this page. If you are building the estimate, use the same scope assumptions — then price to burdened labor, overhead recovery and a real margin.

We never sell leads. Read the promise.

Find a licensed pro

When you are ready to hire for deck project planner, start with licence verification — not with whoever answered first.

No paid placement

Rankings are never sold. Order reflects verification depth and relevance, not payment.

Verify any licence yourself before signing: state licensing hub.

Common questions

Is this free?
Yes — runs in your browser, no account required.
Do I need a permit?
Most attached decks and many detached platforms require permit — verify with AHJ.
Ledger or freestanding?
Attached decks need flashed ledger with bolts — not nails only.
Composite vs wood?
Composite higher upfront, lower staining; PT lowest material, annual maintenance.
How deep are footings?
Below local frost line — contractor should cite depth on plan.
When can I use the deck?
After final inspection — especially railings and stairs.
Who calls 811?
Contractor should document utility locate before digging footings.
What is the hidden cost?
Rot at ledger or rim joist when flashing failed on old deck.
Railing required?
Typically when deck surface is 30 in+ above grade — local rules apply.
How long to build?
2–6 weeks including footing cure and inspections.
Can I expand later?
Yes — plan footings and beam splices; may need new permit for extension.